Home Renovation and ADU Contractor
When it’s time to update your Pacific Grove home, or unlock new income and multigenerational living with an ADU, you need a licensed, local contractor who knows the community as well as the building code.
Aldridge Construction is your professional, insured, and trained team for smart design, precise permitting, and craftsmanship that stands up to coastal weather and time.
From kitchen and bath remodels to full-home renovations, additions, and turnkey ADUs/JADUs, our experts manage everything in-house: site feasibility, Title 24 energy forms, permit submittals, and construction.
We deliver a clear scope, schedule, and budget, and we keep you informed at every step.
Our Services
We’re a full-service, design–build general contractor serving Pacific Grove and the Monterey Peninsula. Whether you’re modernizing an older bungalow, expanding a growing household, or building a rental‑ready ADU, the Aldridge Construction team integrates design, permitting, and construction under one accountable roof.
Home Renovations & Additions
Get more livability from the home you love with thoughtful updates and structurally sound expansions. We optimize circulation, natural light, storage, and energy performance while respecting neighborhood character and historic context where applicable.
- Kitchen & bath remodels: Space planning, cabinetry, tile, plumbing, lighting, ventilation, and high‑performance fixtures for durable beauty and daily comfort.
- Whole-home updates: Flooring, insulation, electrical, HVAC, and envelope improvements that reduce maintenance and elevate efficiency.
- Window/door upgrades: Coastal‑grade units with tighter seals and better daylighting, sized to code with tempered glazing where required.
- Exterior refresh: Siding, roofing, stucco, paint, decks, and railings, detailing that withstands salt air and boosts curb appeal.
- Structural reconfigurations: Engineer‑reviewed wall removals, beam installs, and seismic retrofits that create open plans without compromising safety.
- Room/second‑story additions: New living areas designed to blend with existing architecture; permits and Title 24 energy forms included.
Accessory Dwelling Units (ADUs)
Build flexible housing that fits your lot, budget, and long‑term goals. Aldridge Construction guides you through ADU options, utilities, privacy, and finishes to achieve a warm, independent living space that complements your property.
- Detached & attached ADUs: Stand‑alone cottages or additions planned for privacy, light, and access, great for family or long‑term rental.
- Over‑garage ADUs: Efficient upper‑level layouts with fire‑rated assemblies and structural upgrades where needed.
- Garage conversions: Transform existing footprint into a code‑compliant home with efficient kitchens, baths, and insulation.
- JADUs: Compact units (up to 500 sq. ft.) within the main house, with efficiency kitchens and either shared or separate sanitation.
- Design continuity: Exterior materials and rooflines selected to harmonize with the primary home; geotechnical and structural reports coordinated if triggered.
Pacific Grove ADU Requirements
Pacific Grove applies its own standards on top of state ADU laws. Below is a homeowner-friendly overview of the key requirements; we confirm property-specific details during site feasibility to ensure accuracy.
Predesigned County ADU Plans
If your property is in unincorporated Monterey County (not the City of Pacific Grove), you can use the County’s pre-designed 1–3 bedroom ADU plans in two styles. They can speed up design and approvals, though site plans, Title 24, and permits are still required.
Parking, Short‑Term Rentals & Occupancy
Many city parcels near transit qualify for ADU parking exemptions, and JADUs typically require no new parking. ADUs/JADUs must be rented 30 days or longer, and JADUs require an owner‑occupant in either the main home or the JADU; we plan your layout and lease strategy with these rules in mind.
Utilities & Entries
Detached and attached ADUs plan for independent exterior access and clearly addressed entries. Depending on ADU type, a new or separate utility connection may or may not be required; we evaluate sewer, water (including MPWMD permits), electrical load, and meter strategy during design.
Setbacks & Fire‑Safety
Objective standards allow reduced side/rear setbacks for many ADUs, with additional allowances for conversions; fire safety governs clearance, egress, and whether sprinklers match the primary residence requirement. We position walls, windows, and paths of travel to satisfy both code and privacy.
Setbacks & Fire‑Safety
Objective standards allow reduced side/rear setbacks for many ADUs, with additional allowances for conversions; fire safety governs clearance, egress, and whether sprinklers match the primary residence requirement. We position walls, windows, and paths of travel to satisfy both code and privacy.
Permits We Handle for You
Every ADU or renovation in Pacific Grove has its own path; our team packages the right drawings, energy forms, reports, and applications so you don’t have to.
Coastal & Historic Overlays
Homes in the coastal zone or on the Historic Resources Inventory may need coastal authorization and/or historic review. We prepare objective, context‑sensitive submittals that address visual compatibility, materials, and tree considerations without sacrificing livability.
Water & Environmental
On the Peninsula, water permits and fixture accounting matter. We coordinate MPWMD water permits, backflow, sewer capacity, and any required percolation tests or environmental health steps; if you’re adding trees or removing protected species, we integrate arborist notes into the plan set.
Home Renovation/Additions
For interior/exterior remodels and additions, we handle planning or building permits, structural calcs, Title 24 energy compliance, and inspections, sequenced to minimize downtime, protect occupied spaces, and keep your schedule and budget on track.
ADU/JADU Express Route
ADUs/JADUs that meet objective standards are reviewed ministerially (building‑permit only) with statutory timelines. We assemble complete, code‑aligned submittals up front to help your application move swiftly through plan check.
Our Design–Build Process
From the first walkthrough to the final clean, you’ll have one accountable team managing quality, cost, and schedule.
Consultation & Site Feasibility
We assess lot slope, access, drainage, trees, utilities, and zoning overlays, then outline ADU/renovation pathways, risks, and a preliminary budget range to set clear expectations.
Concept Design & Budget
Our team transforms your goals into measured floor plans, elevations, and a scope matrix, aligning finishes and systems with your priorities, and developing a transparent cost model before permit drawings proceed.
Permitting & Approvals
We prepare stamped plans, Title 24 forms, and required reports; then submit, track corrections, and coordinate any coastal, historic, or water permits, keeping you updated until permit issuance.
Construction
A disciplined schedule, clean site, vetted trades, and milestone inspections keep work moving. We protect neighbors, manage noise and dust, and maintain access for families living in the place.
Construction
A disciplined schedule, clean site, vetted trades, and milestone inspections keep work moving. We protect neighbors, manage noise and dust, and maintain access for families living in the place.
Final Walkthrough & Warranty
We test systems, review manuals, and deliver a punch‑list that actually gets punched. You’ll receive permit sign‑offs, product warranties, and our workmanship warranty, all documented.
Why Homeowners Choose Aldridge Construction
We combine local knowledge with disciplined project management, so your renovation or ADU moves from concept to keys without surprises.
- Local Code & Permit Expertise: We navigate PG municipal code, Historic Resources Inventory (HRI) triggers, coastal overlays, and MPWMD water permits so submittals are complete the first time.
- ADU/JADU Compliance, Handled: From size, height, and parking exemptions to separate entries and rental term rules, we design to meet state and local objective standards, with ministerial approval in mind.
- Water & Coastal Nuances, No Stress: Water credits, backflow, sewer and utility connections, and potential Coastal Development Permit (CDP) needs are coordinated for you.
- Transparent Process, Schedule & Budget: You’ll see line‑item estimates, milestone calendars, and weekly updates, with change‑order controls to keep your goals prioritized.
Ready to reimagine your home with a renovation or addition? Let Aldridge Construction guide you through every step of the process. Visit our Contact Us page to fill out our short form, or call us directly at 831-682-9788 to discuss your project with Brian Aldridge. Together, we can create a space that perfectly suits your lifestyle and preferences.
We bring your vision to life!
Frequently Asked Questions About Home Renovation & Additions
Pacific Grove allows ADUs up to 1,200 sq. ft.; attached ADUs may also be limited to 50% of the primary home’s floor area. JADUs are capped at 500 sq. ft.
If your application meets objective standards and is complete, the City must act ministerially within 60 days (unless you request a delay).
Not if you’re within ½ mile walking distance of public transit; otherwise, one off-street space may be required, and conversions don’t need replacement parking. JADUs require no parking.
No, ADUs and JADUs may not be rented for terms under 30 days in Pacific Grove. Long-term (30+ days) rentals are allowed.
JADUs require the owner to occupy either the JADU or the primary home; standard ADUs have no local owner-occupancy mandate.
Only if the primary residence is required to have sprinklers; ADUs don’t trigger sprinklers in a primary dwelling that otherwise wouldn’t need them.
Utility connections/fees vary by ADU type, and coastal or historic properties may have an added review; tree work in the coastal zone can trigger a CDP. We scope these during feasibility and include them in the permit package.